Jbcc Subcontract Agreement

The principal agent, together with the issuance of a payment certificate to the contractor, shall send to each subcontractor a notification of payment from a subcontractor indicating the amount in the drawer`s payment certificate that is due to the subcontractor. This is not a certificate of funds due between the contractor and the subcontractor N/S. See main construction contract. The document covers both nominated and selected subcontractors and complies with the main construction agreement, while maintaining the same numbering. The JBCC® PBA`s contractual data follow the order of the clauses of the JBCC® ABP agreement – filled in by the employer (main representative) with place to register the names of the parties and representatives, a description of the works, followed by the place by clause to record the relevant information, for example.B. the law of the country, the composition of the contact document as a whole, insurance requirements (by whom, who pays the deductible), information on the location, the characteristics to be protected, working hours, etc.; work to be carried out by designated subcontractors or by a direct contractor; planned dates for the completion of the work as a whole or by section – and, where appropriate, sanctions and criteria for certificates of practical completion; Terms of payment. The contractor completes the rest of the JBCC contract® which details the nature and value of the guarantees, the registration of the sector`s holidays during the planned construction period, the payment and adaptation of the preparatory work, as well as the amount of the offer and the details of the contractor. For public procurement, a separate form of tender in CIDB format must be followed Basic Suite – this option is made available to those who do not wish to register. It allows you to quickly and easily purchase “Reference” and/or “Project” documents that can be downloaded or received by e-mail. Agreements can be printed and completed by hand or electronically. These documents are not stored online and therefore must be downloaded and stored on your computer. An email is sent to the user with a download and print link.

The JBCC® PBA is suitable for all construction contracts and can be used with a parts list or schedule for tariffs and drawings. The ABP is synchronized with the subcontracting agreement N/S JBCC® in order to designate designated and selected subcontractors who bind them to the same conditions as the main contractor The agreement is divided into seven sections of 30 clauses. The content is not only a legal document, but it has also been structured as a checklist to manage the execution of the work and minimize possible disagreements – to effectively use the expensive working hours of all role-playing game players in a construction project The agreement is signed between the employer and the contractor – in relation to the contractual data that covers all contractual variables. First by the employer to obtain offers from the contractors and by the contractor and submitted in the form of a call for tenders The contract is designed to be used when the work is of a minor and simple nature. The employer appoints a senior representative to manage the contract and directs the contractors designated for specialized work and facilities that do not fall under the contractor`s responsibilities or liabilities in connection with the work. The Minor Works Agreement is suitable for use when the contractor is a small to medium-sized enterprise and is not intended for use in which the work is complex or for which designated or selected subcontractors need to be appointed. . . .